It's Party Time: Risks to Consider When Building a Software Project Team
Eric Famanas
~7 min read

Over the recent holiday period, I stepped away from my research work and spent some time playing fantasy role-playing games (RPGs). While the setting is fictional, the mechanics of building an effective party are not. Every decision about roles, coverage, and dependency has immediate and visible consequences.
That experience is difficult to ignore if you spend time thinking about delivery risk. RPGs force players to confront team composition as a systems problem: what capabilities are required, where redundancy is real versus illusory, and how failure propagates when responsibility or coverage is unclear.
Much of my research involves examining how delivery risk surfaces through team structure, coordination, and dependency patterns long before it appears in timelines or metrics. When viewed through that lens, the parallels between an RPG party and a software project team become concrete rather than metaphorical.
In this post, party composition in RPGs is used as an abstraction for exploring the risks involved in forming a software project team, both the obvious risks of missing technical capability, and the less visible risks introduced by collaboration, coordination, and individual agency.
Covering Capability Gaps
One of the most effective early exercises in team formation is a working session focused on roles and responsibilities, but not in the sense of assigning job titles. Rather than starting with statements such as “Bob is the architect” or “Jane owns delivery,” the exercise begins by identifying the concrete tasks required for the project to succeed. For example, in the manga / anime Goblin Slayer, the characters are referred to as only their job class or speciality, they don't actually have names!
This approach echoes principles outlined in The Mythical Man-Month by Fred Brooks, where the emphasis is placed on work to be done rather than positions to be filled. Once those tasks are visible, responsibility is allocated by the project team itself, based on actual capability, capacity, and context, not by external decree.
Any task that cannot be clearly owned within the team structure is a capability gap. Isolated gaps may be manageable; persistent or clustered gaps are signals of structural risk. When those gaps exceed the team’s ability to absorb them, the appropriate response is not optimism or role redefinition, but deliberate augmentation with the required skills or experience.

Using the RPG analogy, a common approach is to plan specific party layouts and equipment depending on the type of activity; this means that the party may be centred around durability for surviving large dungeons, raw damage output for competitive fights, or general well-roundedness for when faced with uncertain situations. However, there will always be certain responsibilities present:
A character will need to own party healing to keep everyone alive
Another character will be the focus of all damage to keep healing coverage simplified
One or more characters will be responsible for dealing damage
When placing software teams in a similar situation, the requirements for a successful project will depend on the deliverable category, i.e. a long-term support (LTS) product, an initial-release development project, or even a proof-of-concept or greenhouse artefact. Across those different types of context, there are common responsibilities:
Someone will need to own the scope definition and change control
Another person will need to coordinate tasks and manage delivery
One or more engineers will be responsible for development work
As mentioned earlier, the key risk-control step is being able to identify and appropriately group these responsibilities so that they may be effectively mapped to roles within the project team.
Overlapping Roles and False Coverage
One of the most common patterns across industries is the idea of having a single person bear multiple responsibilities. On the surface, this is not necessarily a bad thing; a truly capable person can perform a couple of different roles effectively. In fact, one of the LEAN principles is to take advantage of talent, even if it may not be within the individual’s direct remit.

Aside from the more routine dangers of stretching a team member too thin, there is also a psychological risk. Empowering individuals with responsibilities outside of their primary role can create an illusion that a particular team or business function is sufficiently covered, even in the absence of a specialist.
Revisiting our dungeon-adventuring party:
The tank or shield knight may have healing capabilities, but may not heal wounds as efficiently as a healer.
The healer or mage may have magical attacks, but may not do as much damage per second as the damage dealer.
When placing this in the context of a project team:
A project manager may be able to write code, but may not have the specialist expertise of a dedicated software engineer.
A software engineer may have education in project management, but may not necessarily be as knowledgeable as someone dedicated to the field.
When examining these details in isolation, they make sense, right? How about when we talk about critical areas such as human resources (HR), cybersecurity, and legal and compliance? Those areas should also be treated with the same gravity as product-related functions like sales and development. Yet we often see these roles spread across multiple individuals, particularly within small companies.
That being said, there is nothing particularly wrong with having to do things this way; after all, not all companies are created equal, and many of them do not have the luxury of hiring unique staff for each function. The warning here is to recognise that overlapping roles harm both the capacity and velocity of the project team. Any additional functions an individual covers are inherently compromised solely by the fact that they sit outside that person’s primary remit.
Agency and Autonomy as Risk Variables
One of the reasons why I enjoy playing RPGs is the spectrum of approaches that are available to the player in how to tackle an objective. For example, one can simply go on the offensive, attacking the enemy until they are defeated. Another approach would be to target enemy weaknesses, or when fighting a group, attack the weakest members first. Any of these approaches is equally valid.
However, validity may not necessarily translate directly to effectiveness. Just like software projects, the challenges encountered within these types of games are variable rather than static; a successful approach in one encounter may not necessarily be equally successful in the next. In more severe cases, that same approach may result in total failure. Yet this exact situation occurs when teams become too rigid in their ways of working.

It is well documented that when teams adopt new software project management frameworks, such as Scrum, Extreme Programming, SAFe, or DAD, one common mistake is following the framework too rigidly in an effort to ensure all data is captured and quantified. While these practices can help analyse overall project progress, applying change management and control methods too strictly can actually harm outcomes by restricting autonomy and agency.
When we instruct our characters on the RPG board to fight, we do so declaratively, trusting that each individual has a certain degree of expertise within their role. We also do not evaluate their actions against time; an action like an attack will take as long as it takes. The only instance where time becomes a factor is when tasks are asynchronous. A mage casting magic may take twice as long to perform an action, but that does not mean the rest of the team stops. Other members continue to act under their own agency.
Despite this, the most common failure modes in agile development are measuring tasks primarily by how long they are expected to take, and restricting individual agency in support of change management. Together, these behaviours create process bottlenecks that often go unnoticed until delivery begins to stall.
Ultimately, there needs to be a delicately balanced process to ensure that appropriate—but not overly restrictive—controls are put in place. Just as importantly, these controls must be revisited regularly through team retrospectives, rather than treated as fixed once introduced.
Risk Will Always Be There, So We Conquer It, Not Avoid It
Aside from ensuring agency and correctly aligning expertise to tasks, there are many more risks. To date, within my own research, I have captured more than fifty unique factors of risk within software development projects, and the list keeps on growing! So even if we can precisely define what a particular risk is, that doesn't necessarily mean there will be a mitigation strategy to counter it.

What RPGs make clear, and what software projects often hide, is that effectiveness is a property of the system, not the individual. Party composition, agency, and control mechanisms all interact in ways that either support progress or quietly undermine it.
When teams become too rigid, overextend roles, or rely on partial coverage, the resulting risks don’t announce themselves immediately. They surface gradually, through friction, delay, and coordination overhead, long before they appear in delivery metrics. By then, the structure that created them is already doing its work.
Ultimately, internal risks will certainly emerge from within the project team for a variety of reasons, and we cannot plan for them all. In situations like this, empowering teams with the agency to navigate those challenges, supported by effective guidance from the dungeon master (aka the project manager or scrum master) tends to be the most resilient approach.