Believing in Bayesian: A Brief Analysis Introduction

Eric Famanas

~5 min read

Believing in Bayesian: A Brief Analysis Introduction — original article animation

Let's take a step back, all the way back, before the development of generative AI systems and neural networks. Back then, analysts relied on algorithms and approaches developed by subject matter experts to perform predictive analysis based on a given set of data. One particular approach involved simply asking stakeholders to believe.

The aforementioned, of course, is a gross oversimplification of the approach in an attempt at capturing silly humor. However, if you were able to infer it from the blog post title, what we are really talking about are Bayesian Belief Networks (BBNs) that have been in use for some time as a means for risk factor analysis for projects; at the very least, based on what I have been researching for my PhD at Anglia Ruskin University, BBNs have been in use for at least 20 years in managing software projects.

In complex systems such as software engineering projects, uncertainty isn't a problem to eliminate, it's a property to understand; just like risk, uncertainty cannot be eliminated, only reduced or mitigated through applying measures and controls. Delays, budget variances, and communication breakdowns rarely arise from a single factor; they emerge from interdependent casual chains (this would be a nice sedge way into discussing Markov Chains in greater detail, but let's keep on track and focus on Bayesian networks for now). Yet most project analytics frameworks continue to treat risk as an independent, static variable. This is one of the major criticisms behind approaches such as Risk Assessment Matrices.



Thats it, just look to the stars and BELIEVE

Thats it, just look to the stars and BELIEVE

Bayesian Belief Networks - Mapping Uncertainty

As part of my literature review, I have been researching papers around comprehensive mapping studies of how Bayesian networks are used in software project management over the past 20 years. At their core, BBNs are graphical models that represent how uncertain events influence another, like a conceptual map illustrating chains of cause and effect.

Unlike traditional models that rely on fixed formulas or deterministic rules, a BBN uses probability theory to continuously update its beliefs as new evidence emerges. For example, if you learn that communication quality within a software project team has dropped, the network automatically recalculates the probability that coordination issues, and subsequently delivery delays, will follow. Based on the reviewed papers on BBNs and software project management, these areas of uncertainty can be divided into four classes which correlate to the different layers of the project context:


  • Human factors - relative to the internal context (project team) and external context (organization)

  • Technical complexity - team-level knowledge (project team) and technical resource / feasibility (project environment or PESTLE)

  • Organisational structures - the immediate org (external context) and hyper factors surrounding the deliverable's recipients (PESTLE)

  • External volatility - impact on the project structure, which will limit agency, such as external context (organization) and market conditions (PESTLE)


Early research used BBNs as diagnostic tools, such as mapping causes after failure, while modern implementations increasingly use them predictively, estimating the probability of schedule or cost deviation from real-time project signals; these modern applications align more closely with my PhD's objectives in drawing probabilistic reasoning from organizational communication using Natural Language Processing (NLP).



Everything starts with a plan, or a data model in this case

Everything starts with a plan, or a data model in this case

Dynamic Bayesian Networks and Temporal Learning

Static Bayesian models assume dependencies are fixed, but as Agile Software Development practices have shown us, projects evolve over time, and we should take that into account when performing our risk factor calculations.

To address these challenges, some researchers in 2023 have proposed using Dynamic Bayesian Networks (DBN)s for predicting cost overruns. For example, in a case study around construction projects, researched introduced a time-sequential mechanism using an input-output Hidden Markov Method (I/O HMM) with particle filtering that allows probabilities to update as new evidence emerge.

But how do hybrid approaches that compose DBN actually add value to the problem we are trying to solve? First, we can look at what BBNs do well: they model casual relationships among variables, how one factor influences another; this aspect is important to understand as the focus of BBNs is to examine the spatial complexity of a given problem by the numerous functions and variables within it.

In the case of one of our approaches, the further application of I/O HMM as an additional analysis layer, we can take advantage of what a Markov-based approaches like Markov Chains can offer: the ability to observe model state transitions over time, how a system moves from one state to another. Under this lens, we would examine the variable, a risk factor, and how applied functions to it would cause it to change over the course of a project life cycle, allowing us to examine the problem's temporal complexity. A risk factor may be low at the start, but may escalate to high as the project progresses.



We have gone from dozens of parameters to millions of hyper parameters

We have gone from dozens of parameters to millions of hyper parameters

Putting It Together: AI Systems Founded on Bayesian Learning Networks

Taking the concepts of BBN / DBN, and applying it to the research aims leveraging NLP, it is possible to create an AI-enabled project forecasting framework through an evolutionary process:


  1. Evident abstraction - NLP models transform unstructured communication into structured, quantifiable signals.

  2. Belief network integration - A dynamic Bayesian network models casual dependencies among these signals.

  3. Uncertainty propagation - Deep Bayesian kernels refine the model's confidence levels and capture epistemic drift as new data arrives.

  4. Visual communication - A front end system that can present updated probabilities through intuitive graphs and confidence heat maps.


Ultimately, BBN / DBN networks are not just statistical tools; they represent a philosophy of knowledge under uncertainty. Where traditional project analytics seek to eliminate uncertainty through the analysis of low-dimension, static values, Bayesian systems quantify uncertainty to enable actionable insights and empower decision makers.

As we move forward with technological advancements in AI, we cannot forget to also evolve the algorithmic foundations upon which they are founded on. By integrating modern advances in probabilistic deep learning and visual risk communication, these decades-old approaches using BBNs are becoming central to the new generation of AI-augmented project intelligence systems that are capable of learning, adapting, and explaining themselves eloquently to project managers and stakeholders.