Moving a stalled legacy replacement forward

A stalled replacement progressed into proof-of-concept and beta deployments, and one previously lost customer returned.

An event attendee scans a badge at an accreditation desk while staff operate the reader, laptop, and badge printer.

The challenge

When I joined an event-technology company as CTO in 2025, the programme to replace an ageing application had been stalled for approximately three years. The legacy platform had security and stability weaknesses, but its proposed replacement was missing essential capabilities, including basic profile editing and offline recovery. Extensive requirements documents had not translated into a product that fitted customers' operational needs. Earlier attempts at a big-bang transition had contributed to the loss of two customers.

IoT event devices connect through a gateway to an event bus and microservice cluster, with a legacy adapter, security, and database foundations.

The work

I led a technical and requirements reassessment, directing the replacement of roughly half the inherited implementation while retaining the viable security layer, database, and microservices event bus. Drawing on earlier cloud-orchestration experience, I directed engineering work on a layer that allowed modern capabilities to run alongside legacy functionality. Over approximately a year, I worked with the projects team, interviewed customers, and visited sites to understand their workflows. We connected individual features to wider user stories, including RFID scanning and accreditation operations, so that delivery decisions could be checked against practical needs. I personally led proofs of concept with previously lost customers and selected additional beta participants whose workflows fitted the available functionality. We introduced capabilities incrementally and used deployment feedback to guide further development. For full migration planning, I assessed both functional coverage and the operational criticality of the remaining gaps. Once the replacement exceeded 60% of its identified feature requirements, I began preparation discussions with two strategic customers, allowing six months to address the remaining needs before planned migration.

The result

The programme moved from a prolonged stall into successful proof-of-concept and beta deployments. One of the two previously lost customers returned, and direct customer participation became part of the work to define and validate the replacement. By October 2026, the replacement met more than 60% of its identified functional requirements. Readiness was assessed alongside operational criticality, with preparation under way with two strategic customers for planned full migrations in 2027. Completion of the remaining functionality and those migrations formed the next stage of the programme.

Illustration of an event operator and software colleague testing a registration workflow.

Impact

The recovery restored a practical route to modernisation while retaining useful technical foundations. An orchestration layer allowed legacy services and new capabilities to coexist, making incremental deployment possible as the replacement developed. Customer discovery and beta use then connected release decisions with operational needs. Feature coverage was considered alongside the importance of each workflow, including scanning and accreditation activities. This gave migration planning a basis in how customers actually worked and created space to prepare for change, with the broader rollout still ahead.